Monday, June 18, 2012

laundry.craft room


My laundry room started out as nothing special.
 6' x 10' ... Enough room for a future washer and dryer, and random storage sitting on top of builder-standard linoleum.
 Don't forget the lovely MDF shelf. That's a standard feature, too.
 We started the sprucing up by painting it Behr Spa. Ahhh.

Brent installed the washer and dryer, we used the built-in shelf for detergent and other keep-out-of-reach cleaners ...
  and I stored some craft boxes on a tiered shelf and spare cabinet (picture taken pre-paint). Nice.

For a few months we just let the room sit. But we knew the room had way more potential, despite its small size. We tossed around the idea of cabinets and a countertop to utilize wall space and high ceilings. We priced out configurations through cabinet companies but weren't sold on their products or prices. Brent was a stud and researched cabinet options for me at local stores and online. After much consideration and planning, I chose my cabinets and he ordered them online -- saving us lots of cash!
 The cabinets shipped a few weeks later and Brent went straight to work. The uppers went up in a jiffy since they were delivered pre-assembled. Brent is pretty handy with a ledger board and drill. 
 Oh yeah, we also said goodbye to the ugly linoleum. By shopping around we bought this 10x20 gray linen tile for $2.89 sq ft, which was a dollar cheaper per sq ft compared to other stores -- which adds up! Since Brent was juggling several other projects, we had a guy install it for us in the bathrooms and laundry room.
 Once the uppers were in, the base cabinets came next.
 Lookin good, eh? These are Cardell Classic II Flat Panel Maple cabinets in white with pewter glaze. I absolutely love how they have the look of antiqued white cabinets, yet with a modern twist using flat panels and pewter glaze accenting. It fits right in with our modern style.
Then the countertops arrived! This is Silestone (quartz) Stellar Snow. It literally sparkles. Because the amount of quartz we needed was less than an entire slab, we ordered it through Home Depot, who charges by sq ft instead of making you buy an entire slab -- saving more cash!

The guys who installed our baseboards downstairs (a few months back) returned to outfit the upstairs, too. 
So we turned this ...
into ...
 The finished product! Three drawers on the left base cabinets, three big base cabinets on the right. Nine upper cabinets. Space for me to sit and do crafts. And still enough room for the washer and dryer. All within 6' x 10'.
I am beyond thrilled to have my own little mom cave.

Maybe I'll even add a chandelier.

Tuesday, December 13, 2011

kitchen comes to an end

chapter 1
chapter 2  
chapter 3 

We finally tiled the backsplash. The kitchen is finished.

Before the move we scored this glass/marble tile for $6 a sheet at Bedrosians. We found it in the "seconds" section (normally goes for $15-20 a sheet), but despite some areas of inconsistency or discoloration, it looked pretty good.
We knew we wanted it in our kitchen so we bought five boxes. We had no idea what we were getting ourselves into.

11.04.11
Prep work. Brent and I taped paper over our countertops and filled in wall holes (from the old backsplash tear out) to make  it easier for the thin set and tile to adhere to the wall.
11.05.11
After watching lots of how-to videos online, we figured we could accomplish most of the project in one day. Hah. Snag after snag kept pushing back our start time. Wrong tile blade, electrical wiring in the way of the vent hood, no studs for the hood to be secured to, wrong grout, wrong size of screws, not enough wire, not enough caulk, needed more tools ...

I made two or three trips to home improvement stores. Brent cut a 1x2 ft hole in the wall, moved the electrical unit and wiring, and installed studs to support the range hood.
And we found the only store in Vegas open later than 5pm on a Saturday that carried a glass tile blade for a wet saw. Miracle.
We finally got started at 8:30pm that night.
Through trial and error, we learned the proper consistency for thin set, how to spread it on the wall, how to apply the tile and help it bond with the thin set, how to space sheets evenly with spacers ...
We finished this section at 11:15pm and went to bed.

We spent the next several days installing more tile.
11.10.11
We got to the other end of the wall and realized we needed to buy more tile (to finish where the hood would go).
Bought another box, installed it ...

11.15.11
Grouted the tile. What a mess.
We spent a few days caulking and sealing, Brent installed the vent hood, I painted most of what was left of the kitchen, Brent finished edging the paint, and now ...

the end.

epilogue: I may have been without a stove for two weeks with the rest of the kitchen as a construction zone, but it was worth it.
 